Contractors must follow these steps to install solar panels:
- Download and complete the application (pdf)
- Submit your application and pay the required fees at Community and Economic Development (20 N. Main, 2nd Floor)
- Wait for design review (about 2-4 weeks)
- After review, you will be given a "Notice to Proceed"
- When complete, get your final inspection and you'll receive a "Permission to Operate"
Fees
Permit Fee $150.00
Plan Review Fee $50.00Production Meter $157.00State 1% Fee $1.50Meter connect/Transformer $50.00*Total (with existing meter) $408.50
*If the existing meter needs to be upgraded, this fee will be adjusted to reflect the cost of the upgraded meter.