Steps:   

  1. Watch orientation video here (link not available)
  2. Read Title 10.05. Distributed Generation Interconnection (link to the left)
  3. Download and complete the application (pdf) Temporarily Unavailable
  4. Submit your application (permits@bcutah.org)
  5. Wait for design review - will be completed by West Coast Code Consultants
  6. After review, pay your permit fees to Community Development and install your panels.
  7. Call Cody Richards @ WC3 for inspection following installation, 435-760-5586.
  8. When final inspection is received from WC3, Brigham City will issue you a "Permission to Operate" letter.


Brigham City Permit Fees (review and inspection will be separate)

Permit Fee                              $150.00
Administrative Fee                  $  50.00

Production Meter                    $ 205.00
State 1% Fee                          $    1.50
Meter connect/Transformer   $    50.00

Total (with existing meter)      $456.50