Skip Navigation Website Accessibility

Residential Permit Applications





Solar Panel (Photovoltaic):

New, upgraded, or removal of residential solar panels.

Please submit electronic copies of all plans.  The email address can be found on the top of the photovoltaic application. 




Roofing permit:

New shingles, re-shingle, new roofing (Plywood or OSB)





Residential Electric Permit:

New meter or main disconnect, upgraded meter enclosure, or power service

Power disconnect Monday-Thursday 

48 hours notice to disconnect power and schedule an inspection





Furnace/HVAC:

Water Heater/Broiler:

New, upgraded furnace or water heater






Demolition - Online

Remove or demolish residential structures.

- Permit  Requirments
- Paper Application 






Windows:

New or replaced windows


 

Agricultural Permit Application:

Agricultural permits